Arts (125)
    Asian & African (8)
    Books (560)
    Boxes & Tea Caddies (85)
    Clocks (36)
    Decorative (398)
    Dolls & Bears (122)
    Figurines (530)
    Furniture (24)
    Glass (1736)
  ...
View All


Search our
Dealer/Mall
Stores!
 
 



Poodle, Spaghetti Trim, Ucagco




Collector Books

The Journal of Antiques and Collectibles





1953 Champion Spark Plugs Chuck Stevenson AAA Racing Original Magazine Print Ad For Sale


1953 Champion Spark Plugs Chuck Stevenson AAA Racing Original Magazine Print Ad
When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.


Buy Now

1953 Champion Spark Plugs Chuck Stevenson AAA Racing Original Magazine Print Ad:
$2.96

1953 Champion Spark Plugs Chuck Stevenson AAA Racing Original Magazine Print Ad


- Original 1953 Champion Spark Plugs full-page magazine advertisement

- Honors Chuck Stevenson as the 1952 AAA National Racing Champion

- Features the large AAA emblem and detailed championship medal artwork

- Displays a period Champion spark plug with classic automotive branding

- Strong appeal for AAA, Indianapolis racing, automobilia and garage-display collectors

- Approximately 10 x 14 inches and kept in a protective sleeve

- Fair vintage condition with age toning, upper-margin discoloration, light creasing, waviness, and minor edge and corner wear; the artwork and text remain complete


Please review all photos-they are part of the description.


📦 Shipping & Handling


Shipping Rates:


• Paper & Ephemera: Flat rate of $5.95 via USPS Ground Advantage.


• Standard Items: Calculated shipping based on your location and the package weight/dimensions.


• Premium Items: Free shipping on select high-value items (as noted in the specific listing).


• Combined Shipping Discount: We gladly combine shipping to save you money! For ephemera, you only pay shipping for the FIRST item—all additional paper items in your cart SHIP FOR FREE. For mixed standard items, combined shipping is calculated based on the actual combined weight of the package.


• How to Combine / Request an Invoice: Please add all items to your cart before paying to apply automatic discounts. If your cart doesn\'t automatically combine shipping correctly, go to your shopping cart (this works best on a desktop browser) and click \"Request total from seller\" located above your items. We will send you an updated invoice with the correct shipping rate. If you happen to make multiple separate purchases, don’t worry—we will automatically combine them and refund the shipping overage once your label is printed!


• Safe Delivery: Paper is fragile! All ephemera items are shipped in a protective archival sleeve and a rigid, heavy-duty stay-flat mailer to ensure they arrive unbent and ready for framing. All other vintage items are packed securely with the utmost care.


• Handling Time: 1–3 business days.


About Lakeside Vintage


We are a non-smoking, pet-friendly home. We strive to accurately describe every vintage find. If you have any questions, please message us before purchasing. We want you to be thrilled with your item and love it as much as we loved finding it!


Buy Now








Related Items:

1953 Champion Annual Central High School Chattanooga Tennessee picture

1953 Champion Annual Central High School Chattanooga Tennessee

$44.00



1953 Champion Spark Plugs Fence Hopping Crop Duster Airplane Vintage Print Ad picture

1953 Champion Spark Plugs Fence Hopping Crop Duster Airplane Vintage Print Ad

$9.95



1953 Champion Spark Plugs Chuck Stevenson AAA Racing Original Magazine Print Ad picture

1953 Champion Spark Plugs Chuck Stevenson AAA Racing Original Magazine Print Ad

$2.96






  Shopping Cart 
(Your shopping cart is empty)
Subtotal: $0.00
View Cart | Checkout


  Recently Viewed

1.  Lacquered Cedar Wood Box
2.  The White Horse Established 1742 Sign Signed
3.  Pewter Framed Tile, Plate. Ship, Sailing


  Latest Items

1.  Basket, Handpainted,
2.  Apricot Wildflower Pattern Bell
3.  Jade, Jadeite Glass Bell, Westmoreland
4.  Green Glass Strawberry Ptn. Bell
5.  Aladdin Lamp, Rose and White Moonstone


  Facebook



 


Secure Websites

Online Payments

 


| Search Items | Member Profile | My Favorites | Auto Notify | FAQ | Links | Sitemap |
Terms of Use | Privacy Policy | Tell Your Friends | Newsletters/Articles/Press Releases |


Antiques, collectibles, estate items, reproductions & art from dealers & collectors world wide at JosephMarc.
Copyright © 2004-2011 JosephMarc, Inc. All rights reserved.